Friday, May 30, 2008

University Area Commission Election Poll Workers needed - Sat. June 7, 2008

SPECIAL COMMUNITY NOTICE

Hello University Area Neighbors,

The University Area Commission is in need of UAC Eleciton Poll workers
to volunteer Saturday, June 7, 08 between 10:00am - 4:00pm to work two
hour shifts.

If you are interested in volunteering, please email Lissa Warncke at
lisabeth.warncke@gmail.com.

More information on this year's election can be found at
http://www.universityareacommission.org/elections.htm

If you are interested in running for the UAC, you can download a
candidate packet here.

OFFICIAL Candidate WRITE-IN Declaration of Intent form is due next
Monday June 2, 2008 4:30pm to the UAC Office - Northwood High
Building, 2nd Floor, 2231 N. High Street.

If you would like to arrange to drop off the form or election packets,
please email Lissa Warncke at lisabeth.warncke@gmail.com.

Please share this email with anyone that might be interested in
helping or is interested in running for the UAC.

Thanks

Ian MacConnell, President
University Area Commission

UAC Elections to be held June 7, 2008-

Saturday, May 17, 2008

Community Garden Update

Good morning, NECKO -

Sean Cunningham has posted a letter with all the details of the neighborhood community garden at this link.

"NECKO Garden Proposal":
http://docs.google.com/Doc?id=dfqhzbt3_2gcqn96c9&invite=

In sum, it's an idea for a pilot garden this summer with bigger plans for next year. Take a look!

Have a good weekend - William

Tuesday, May 13, 2008

Project Update: 9th Avenue Garage Expansion

FYI...

FOD Project Update

fod_logo_email_version

9th Avenue Garage Expansion (MCFP)

 

May 12, 2008

The 9th Ave Parking Garage Expansion is the addition of a second 1000-car garage east of the existing parking garage located on the corner of 9th Avenue and Medical Center Drive. This garage will occupy the site of an existing university surface parking lot along 9th Avenue. The construction is slated to begin in the summer of 2008 and to be completed in late summer 2009. The alleys adjacent to the project will be resurfaced or replaced, depending on underground conditions. Traffic flow in and around the site will be temporarily interrupted at times as construction and utility work commences.

9th_ave_garage_6

 

Project

Updates

May 7

The contracting team has been selected by public bid process and the contracts awarded. The electrical contractor will begin mobilization soon and be working in the north-south and east-west alleys within the next two weeks. Look for temporary closures of the alleys around the construction site.

 

Project

Status

Report

The target date to begin construction is June 9, 2008 after spring quarter Commencement. Look for further detailed information updates as construction begins.

 

Next

Update

We anticipate issuing the next update in mid-July. This will allow us to include pertinent information from the early construction excavations and below grade work.

 

University

Contacts

You can contact the FOD project manager or construction manager if you have questions or comments:

Charlie Conner, Project Manager, 292-3341, conner.26@ osu.edu

Glenn Gerhart, Construction Manager, 688-5606, gerhart.1@osu.edu

 

Glenn will be our primary representative in the field as this project moves into the construction phase. Please direct all construction-related questions/comments to Glenn.

 

 


Thursday, May 1, 2008

Join us for the Neighborhood Cleanup - This Saturday 10 a.m. - 2 p.m.

Hello, NECKO!

The annual Spring NECKO neighborhood cleanup is this Saturday, May 3rd from 10 a.m to 2 p.m. Come early if possible, but join us at any point!

We'll meet at 1471 Michigan Avenue and provide all the tools folks need along with cookies, hats, and lemonade!  Special thanks to Dan Emch for coordinating things again this year!!

Please let me know if you have any questions, otherwise, we'll see you
Saturday morning.

- William